Follow
Yi-Chi Wang
Yi-Chi Wang
Professor of Industrial Engineering and Systems Management, Feng Chia University
Verified email at fcu.edu.tw - Homepage
Title
Cited by
Cited by
Year
Application of reinforcement learning for agent-based production scheduling
YC Wang, JM Usher
Engineering applications of artificial intelligence 18 (1), 73-82, 2005
3022005
Lot cycle time prediction in a ramping-up semiconductor manufacturing factory with a SOM–FBPN-ensemble approach with multiple buckets and partial normalization
T Chen, YC Wang, HR Tsai
The International Journal of Advanced Manufacturing Technology 42, 1206-1216, 2009
812009
Incorporating the FCM–BPN approach with nonlinear programming for internal due date assignment in a wafer fabrication plant
T Chen, YC Wang
Robotics and Computer-Integrated Manufacturing 26 (1), 83-91, 2010
662010
A note on ‘optimization of multi-pass turning operations using ant colony system’
YC Wang
International Journal of Machine Tools and Manufacture 47 (12-13), 2057-2059, 2007
622007
Learning policies for single machine job dispatching
YC Wang, JM Usher
Robotics and Computer-Integrated Manufacturing 20 (6), 553-562, 2004
552004
An agent-based fuzzy collaborative intelligence approach for precise and accurate semiconductor yield forecasting
T Chen, YC Wang
IEEE Transactions on Fuzzy Systems 22 (1), 201-211, 2013
502013
Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics
IL Wang, YC Wang, CW Chen
Flexible Services and Manufacturing Journal 25, 343-366, 2013
442013
Evaluating flexibility on order quantity and delivery lead time for a supply chain system
YC Wang
International Journal of Systems Science 39 (12), 1193-1202, 2008
442008
A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory—a simulation study
T Chen, YC Wang
The International Journal of Advanced Manufacturing Technology 45, 110-121, 2009
412009
A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory—a simulation study
T Chen, YC Wang, HC Wu
International Journal of Innovative Computing, Information and Control 5 (8 …, 2009
402009
Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab
T Chen, HC Wu, YC Wang
Applied Soft Computing 9 (4), 1225-1231, 2009
392009
A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant
T Chen, A Jeang, YC Wang
The International Journal of Advanced Manufacturing Technology 36, 570-581, 2008
392008
A reinforcement learning approach for developing routing policies in multi-agent production scheduling
YC Wang, JM Usher
The International Journal of Advanced Manufacturing Technology 33, 323-333, 2007
362007
A fuzzy-neural approach for global CO2 concentration forecasting
T Chen, YC Wang
Intelligent Data Analysis 15 (5), 763-777, 2011
312011
A simulation analysis of part launching and order collection decisions for a flexible manufacturing system
YC Wang, T Chen, H Chiang, HC Pan
Simulation Modelling Practice and Theory 69, 80-91, 2016
292016
An iterative procedure for optimizing the performance of the fuzzy-neural job cycle time estimation approach in a wafer fabrication factory
T Chen, YC Wang
Mathematical Problems in Engineering 2013, 2013
282013
A bi-criteria nonlinear fluctuation smoothing rule incorporating the SOM–FBPN remaining cycle time estimator for scheduling a wafer fab—a simulation study
T Chen, YC Wang
The International Journal of Advanced Manufacturing Technology 49, 709-721, 2010
252010
A fuzzy set approach for evaluating and enhancing the mid-term competitiveness of a semiconductor factory
T Chen, YC Wang
Fuzzy Sets and Systems 160 (5), 569-585, 2009
252009
A bi-criteria four-factor fluctuation smoothing rule for scheduling jobs in a wafer fabrication factory
TC Chen, YC Wang, YC Lin
International Journal of Innovative Computing, Information and Control 6 (10 …, 2010
232010
A sensitivity analysis of solving joint replenishment problems using the RAND method under inaccurate holding cost estimates and demand forecasts
YC Wang, WT Cheng
Computers & Industrial Engineering 55 (1), 243-252, 2008
222008
The system can't perform the operation now. Try again later.
Articles 1–20