Follow
Mehdi MIR RAJABI
Mehdi MIR RAJABI
Drilling Engineer
Verified email at harbourenergy.com
Title
Cited by
Cited by
Year
The MPD Well Control Matrix; What is Actually Happening
M Mir Rajabi, DM Hannegan, DD Moore
SPE Annual Technical Conference and Exhibition, 2014
152014
New Generation of MPD Drilling Software-From Quantifying to Control
SA Rostami, F Gumus, D Simpkins, I Pobedinski, K Kinik, MM Rajabi
SPE Annual Technical Conference and Exhibition, 2016
122016
Device and method for controlling return flow from a bore hole
MM Rajabi, RS Stave
US Patent 9,068,420, 2015
102015
Possible Alternatives for Deep-Water Gas Charged Accumulators
MM Rajabi, M Amani
Advances in Petroleum Exploration and Development 3 (2), 31-41, 2012
72012
Successful implementations of tophole managed pressure cementing and managed pressure drilling in the caspian sea
MM Rajabi, B Rohde, N Maguire, R Stave, R Tapper
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference …, 2012
72012
Possible Alternatives for Gas-Charged Accumulators in Deep Water
M Amani, M Mir-Rajabi, HC Juvkam-Wold, JJ Schubert
International Oil & Gas Conference and Exhibition in China, 2006
42006
The deep water gas charged accumulator and its possible replacements
M Mir Rajabi
Texas A&M University, 2006
32006
Current accumulator design methods are inadequate for deepwater drilling
M Amani, MM Rajabi, JJ Schubert
Offshore Technology Conference, 2006
32006
System and method for inhibiting an explosive atmosphere in open riser subsea mud return drilling systems
MM Rajabi, B Rohde, RS Stave
US Patent 9,322,232, 2016
22016
Post Well Pore Pressure Analysis Facilitated by Managed Pressure Drilling
AW Brands, MM Rajabi
IADC/SPE Asia Pacific Drilling Technology Conference, 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–10