Follow
Øystein Arild
Øystein Arild
Verified email at uis.no
Title
Cited by
Cited by
Year
A widespread review of smart grids towards smart cities
M Farmanbar, K Parham, Ø Arild, C Rong
Energies 12 (23), 4484, 2019
1092019
Leakage calculator for plugged-and-abandoned wells
F Moeinikia, EP Ford, HP Lohne, Ø Arild, MM Majoumerd, KK Fjelde
SPE Production & Operations 33 (04), 790-801, 2018
742018
Optimum performance of a single effect desalination unit integrated with a SOFC system by multi-objective thermo-economic optimization based on genetic algorithm
J Beyrami, A Chitsaz, K Parham, Ø Arild
Energy 186, 115811, 2019
352019
Wellbore characteristics that control debonding initiation and microannuli width in finite element simulations
J Wise, A Cedola, R Nygaard, G Hareland, Ø Arild, HP Lohne, EP Ford
Journal of Petroleum Science and Engineering 191, 107157, 2020
342020
The How's and Why's of probabilistic well cost estimation
T Løberg, Ø Arild, A Merlo, P D'Alesio
IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition?, SPE …, 2008
272008
A probabilistic methodology to evaluate the cost efficiency of rigless technology for subsea multiwell abandonment
F Moeinikia, KK Fjelde, A Saasen, T Vrålstad, Ø Arild
SPE Production & Operations 30 (04), 270-282, 2015
222015
REPP-CO2: equilibrium modelling of CO2-rock-brine systems
M Klajmon, V Havlová, R Červinka, A Mendoza, J Franců, R Berenblyum, ...
Energy Procedia 114, 3364-3373, 2017
172017
Establishment of a quantitative risk-based approach for evaluation of containment performance in the context of permanently plugged and abandoned Petroleum wells
Ø Arild, HP Lohne, MM Majoumerd, EP Ford, F Moeinikia
Offshore Technology Conference, D032S059R007, 2017
152017
Uncertainty-Based Approach for Predicting the Operating Window in UBO Well Design
JE Udegbunam, KK Fjelde, Ø Arild, E Ford, HP Lohne
SPE Drilling & Completion 28 (04), 326-337, 2013
152013
KickRisk—A well specific approach to the quantification of well control risks
Ø Arild, EP Ford, T Løberg, JWT Baringbing
SPE Asia Pacific Oil and Gas Conference and Exhibition, SPE-124024-MS, 2009
142009
BlowFlow-a New Tool within Blowout Risk Management
Ø Arild, KK Fjelde, A Merlo, B Daireaux, T Løberg
IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition?, SPE …, 2008
142008
An innovative tool on a probabilistic approach related to the well construction costs and times estimation
A Merlo, P D'Alesio, T Loberg, O Arild
SPE Europec featured at EAGE Conference and Exhibition?, SPE-121837-MS, 2009
132009
Collaboration and decision support in geosteering
R Fjellheim, M Herbert, Ø Arild, R Bisio, Ø Holo
SPE Intelligent Energy International Conference and Exhibition, SPE-128721-MS, 2010
112010
A Monte Carlo approach to value of information evaluation
O Arild, HP Lohne, RB Bratvold
International Petroleum Technology Conference, IPTC-11969-MS, 2008
112008
Consequence quantification of barrier system failures in permanently plugged and abandoned wells
E Ford, F Moeinikia, MM Majoumerd, HP Lohne, Ø Arild
SPE Norway Subsurface Conference?, D011S003R001, 2018
92018
Evaluating cost efficiency of rigless P&A for subsea multiwell campaign
F Moeinikia, KK Fjelde, A Saasen, T Vrålstad, Ø Arild
SPE/IADC Drilling Conference and Exhibition, SPE-167923-MS, 2014
92014
Risk-based decision support for planning of an underbalanced drilling operation
Ø Arild, T Nilsen, M Sandøy
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference …, 2004
92004
Quantitative evaluation of imputation methods using bounds estimation of the coefficient of determination for data-driven models with an application to drilling logs
J Cao, AT Tunkiel, Ø Arild, D Sui
SPE Journal 28 (04), 1895-1911, 2023
72023
A 3D stochastic approach for seismic reflector detection
M Nickel, Ø Arild, M Østebø, Ø Haugen, L Sønneland
SEG Technical Program Expanded Abstracts 1999, 1841-1843, 1999
71999
Time-to-failure estimation of barrier systems in permanently plugged and abandoned wells
Ø Arild, HP Lohne, HJ Skadsem, EP Ford, JT Selvik
International Conference on Offshore Mechanics and Arctic Engineering 58875 …, 2019
52019
The system can't perform the operation now. Try again later.
Articles 1–20