The use of andon in high rise building
SL Kemmer, MA Saraiva, LFM Heineck, AVL Pacheco, MV Novaes, ...
proceedings of the 14th annual conference of the international group for …, 2006
342006
Medium-term planning: contributions based on field application
SL Kemmer, LFM Heineck, MV Novaes, CAMA Mourão, TCL Alves
International Group for Lean Construction, 2007
292007
Incentives and innovation to sustain lean construction implementation
TCL Alves, JP Barros Neto, LFM Heineck, SL Kemmer, PE Pereira
Annual Conference of the International Group for Lean Construction, 2009
282009
Suggestions to improve lean construction planning
B Dave, JP Hämäläinen, S Kemmer, L Koskela, A Koskenvesa
Proceedings of the 23rd Annual Conference of the International Group for …, 2015
262015
BIM-FM implementation: an exploratory invesigation
R Codinhoto, A Kiviniemi, S Kemmer, CG da Rocha
International Journal of 3-D Information Modeling (IJ3DIM) 2 (2), 1-15, 2013
262013
Using the line of balance for production system design
SL Kemmer, LFM Heineck, TCL Alves
Encontro Nacional de Engenharia de Produção, 2008
262008
Method to implement delayed product differentiation in construction of high-rise apartment building projects
CG da Rocha, SL Kemmer
Journal of construction engineering and management 139 (10), 05013001, 2013
202013
Developing a lean model for production management of refurbishment projects
S Kemmer, L Koskela
Proceedings of the 20th annual conference of the international group for …, 2012
192012
Guidelines for the management of complex socio-technical systems: an exploratory study of a refurbishment project
TA Saurin, J Rooke, L Koskela, S Kemmer
21st Annual Summit of the International Group for Lean Construction 1, 13-22, 2013
152013
A lean way of design and production for healthcare construction projects
S Kemmer, L Koskela, S Sapountzis, R Codinhoto
122011
Towards a lean model for production management of refurbishment projects, VTT Technology: 94
S Kemmer, LJ Koskela, V Nykänen
VTT Technology 94, 2013
112013
Application of lean principles to manage a customization process
SL Kemmer, CG Rocha, LO Meneses, AVL Pacheco, CT Formoso
ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION 18, 306-315, 2010
112010
Melhorias de processos com a aplicação da filosofia lean
TR Francelino, JP Barros Neto, LFM Heineck, MC Teixeira, SL Kemmer
ENEGEP, 2006
102006
Integrating product and process design in construction
CG da Rocha, S Kemmer
Construction management and economics 36 (9), 535-543, 2018
92018
Managing customization strategies to reduce workflow variations in house building projects
CG da Rocha, SL Kemmer, L Meneses
Journal of construction engineering and management 142 (8), 05016005, 2016
92016
Implementing last planner in the context of social housing retrofit
S Kemmer, C Biotto, F Chaves, L Koskela, P Tzortzopoulos
Proc. 24th Ann. Conf. of the Int˘l. Group for Lean Construction, Boston, MA …, 2016
92016
Lean office at a construction company
SL Kemmer, TCL Alves, M Macedo, MV Novaes, JP Barros Neto
Annual Conference of the International Group for Lean Construction, 2009
92009
Managing the information flow in customised apartment building projects
CG da Rocha, SL Kemmer, L Meneses, CT Formoso
Proc., 21th Annual Conf. of the Int. Group for Lean Construction, edited by …, 2013
62013
Análise de diferentes tempos de ciclo na formulação de planos de ataque de edifícios de múltiplos pavimentos
SL Kemmer
Florianópolis, SC, 2006
62006
Closure to “Method to implement delayed product differentiation in construction of high-rise apartment building projects” by Cecília Gravina da Rocha and Sergio Luiz Kemmer
CG da Rocha, SL Kemmer
Journal of construction engineering and management 141 (2), 07014004, 2015
52015