TitleCited byYear
Transportation decision making: Principles of project evaluation and programming
KC Sinha, S Labi
John Wiley & Sons, 2011
3882011
Soil–water characteristic curve variability
CE Zapata, WN Houston, SL Houston, KD Walsh
Advances in unsaturated geotechnics, 84-124, 2000
211*2000
An analysis of cost overruns and time delays of INDOT projects
C Bordat, BG McCullouch, S Labi, KC Sinha
Joint Transportation Research Program, 2004
1102004
Life-cycle evaluation of flexible pavement preventive maintenance
S Labi, KC Sinha
Journal of Transportation Engineering 131 (10), 744-751, 2005
1082005
Life cycle cost analysis for INDOT pavement design procedures
G Lamptey, MZ Ahmad, S Labi, KC Sinha
Joint Transportation Research Program, 2005
952005
Decision support for optimal scheduling of highway pavement preventive maintenance within resurfacing cycle
G Lamptey, S Labi, Z Li
Decision Support Systems 46 (1), 376-387, 2008
882008
Measures of short-term effectiveness of highway pavement maintenance
S Labi, KC Sinha
Journal of Transportation Engineering 129 (6), 673-683, 2003
812003
Evaluating the cost effectiveness of flexible rehabilitation treatments using different performance criteria
M Irfan, MB Khurshid, S Labi, W Flora
Journal of Transportation Engineering 135 (10), 753-763, 2009
722009
Three-stage least-squares analysis of time and cost overruns in construction contracts
A Bhargava, PC Anastasopoulos, S Labi, KC Sinha, FL Mannering
Journal of construction engineering and management 136 (11), 1207-1218, 2010
712010
Estimating cost discrepancies in highway contracts: Multistep econometric approach
K Gkritza, S Labi
Journal of Construction Engineering and Management 134 (12), 953-962, 2008
712008
Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type
M Irfan, MB Khurshid, P Anastasopoulos, S Labi, F Moavenzadeh
International Journal of Project Management 29 (1), 78-92, 2011
642011
The effectiveness of maintenance and its impact on capital expenditures
S Labi, K Sinha
Joint Transportation Research Program, 208, 2003
622003
Empirical assessment of the likelihood and duration of highway project time delays
PC Anastasopoulos, S Labi, A Bhargava, FL Mannering
Journal of Construction Engineering and Management 138 (3), 390-398, 2011
612011
Effectiveness of highway pavement seal coating treatments
S Labi, KC Sinha
Journal of transportation engineering 130 (1), 14-23, 2004
572004
Effectiveness of microsurfacing treatments
S Labi, G Lamptey, SH Kong
Journal of transportation engineering 133 (5), 298-307, 2007
562007
Dependence of damping correction factors for response spectra on duration and numbers of cycles
PJ Stafford, R Mendis, JJ Bommer
Journal of structural engineering 134 (8), 1364-1373, 2008
552008
Efficacies of roadway safety improvements across functional subclasses of rural two-lane highways
S Labi
Journal of safety research 42 (4), 231-239, 2011
522011
Analysis of long-term effectiveness of thin hot-mix asphaltic concrete overlay treatments
S Labi, G Lamptey, S Konduri, KC Sinha
Transportation Research Record 1940 (1), 2-12, 2005
522005
Optimization techniques for secondary wastewater treatment system
CC Tang, ED Brill Jr, JT Pfeffer
Journal of Environmental Engineering 113 (5), 935-951, 1987
51*1987
Trade-off analysis for multiobjective optimization in transportation asset management by generating Pareto frontiers using extreme points nondominated sorting genetic algorithm II
Q Bai, S Labi, KC Sinha
Journal of Transportation Engineering 138 (6), 798-808, 2011
492011