Παρακολούθηση
Bhaba R. Sarker
Bhaba R. Sarker
Η διεύθυνση ηλεκτρονικού ταχυδρομείου έχει επαληθευτεί στον τομέα lsu.edu - Αρχική σελίδα
Τίτλος
Παρατίθεται από
Παρατίθεται από
Έτος
An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
AMM Jamal, BR Sarker, S Wang
Journal of the operational research society 48, 826-833, 1997
8561997
Supply chain models for perishable products under inflation and permissible delay in payment
BR Sarker, AMM Jamal, S Wang
Computers & Operations Research 27 (1), 59-75, 2000
4392000
Optimal payment time for a retailer under permitted delay of payment by the wholesaler
AMM Jamal, BR Sarker, S Wang
International Journal of Production Economics 66 (1), 59-66, 2000
3632000
Optimal manufacturing batch size with rework process at a single-stage production system
AMM Jamal, BR Sarker, S Mondal
Computers & industrial engineering 47 (1), 77-89, 2004
3552004
An order-level lot size inventory model with inventory-level dependent demand and deterioration
BR Sarker, S Mukherjee, CV Balan
International Journal of Production Economics 48 (3), 227-236, 1997
2211997
Optimal payment time under permissible delay in payment for products with deterioration
BR Sarker, AMM Jamal, S Wang
Production Planning & Control 11 (4), 380-390, 2000
2142000
The performance of push and pull systems: a simulation and comparative study
BR Sarker, JA Fitzsimmons
The International Journal of Production Research 27 (10), 1715-1731, 1989
2061989
Minimizing maintenance cost for offshore wind turbines following multi-level opportunistic preventive strategy
BR Sarker, TI Faiz
Renewable energy 85, 104-113, 2016
1952016
A study of optimal allocation of computing resources in cloud manufacturing systems
Y Laili, F Tao, L Zhang, BR Sarker
The International Journal of Advanced Manufacturing Technology 63, 671-690, 2012
1722012
Metaheuristics for project and construction management–A state-of-the-art review
TW Liao, PJ Egbelu, BR Sarker, SS Leu
Automation in construction 20 (5), 491-505, 2011
1722011
Optimal batch sizing in a multi-stage production system with rework consideration
BR Sarker, AMM Jamal, S Mondal
European Journal of Operational Research 184 (3), 915-929, 2008
1722008
An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
BR Sarker, GR Parija
Journal of the Operational Research Society 45, 891-900, 1994
1601994
Travel time models in automated storage/retrieval systems: A critical review
BR Sarker, PS Babu
International Journal of Production Economics 40 (2-3), 173-184, 1995
1511995
Improving performance by coordinating a supply chain with third party logistics outsourcing under production disruption
BC Giri, BR Sarker
Computers & Industrial Engineering 103, 168-177, 2017
1462017
Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
S Wang, BR Sarker
European Journal of Operational Research 172 (1), 179-200, 2006
1462006
Economic manufacturing quantity in a just-in-time delivery system
DY Golhar, BR Sarker
The International Journal of Production Research 30 (5), 961-972, 1992
1451992
Effects of inflation and the time value of money on order quantity and allowable shortage
BR Sarker, H Pan
International Journal of Production Economics 34 (1), 65-72, 1994
1351994
A survey and critical review of flexibility measures in manufacturing systems
BR Sarker, S Krishnamurthy, SG Kuthethur
Production Planning & Control 5 (6), 512-523, 1994
1201994
Grouping efficiency measures in cellular manufacturing: a survey and critical review
BR Sarker
International Journal of Production Research 37 (2), 285-314, 1999
1171999
A similarity coefficient measure and machine-parts grouping in cellular manufacturing systems
KMS Islam, BR Sarker
International journal of production research 38 (3), 699-720, 2000
1162000
Δεν είναι δυνατή η εκτέλεση της ενέργειας από το σύστημα αυτή τη στιγμή. Προσπαθήστε ξανά αργότερα.
Άρθρα 1–20