Follow
Michael Khoo Boon Chong
Michael Khoo Boon Chong
Professor of Statistics, Universiti Sains Malaysia
Verified email at usm.my
Title
Cited by
Cited by
Year
Optimization designs of the combined Shewhart-CUSUM control charts
Z Wu, M Yang, W Jiang, MBC Khoo
Computational Statistics & Data Analysis 53 (2), 496-506, 2008
1152008
The synthetic [Xbar] chart with estimated parameters
Y Zhang, P Castagliola, Z Wu, MBC Khoo
IIE Transactions 43 (9), 676-687, 2011
1142011
A synthetic double sampling control chart for the process mean
MBC Khoo, HC Lee, Z Wu, CH Chen, P Castagliola
IIE Transactions 43 (1), 23-38, 2010
1072010
A moving average control chart for monitoring the fraction non‐conforming
MBC Khoo
Quality and Reliability Engineering International 20 (6), 617-635, 2004
1012004
Using Lean Six Sigma to improve mobile order fulfilment process in a telecom service sector
M Shamsuzzaman, M Alzeraif, I Alsyouf, MBC Khoo
Production Planning & Control 29 (4), 301-314, 2018
942018
Design of runs rules schemes
MBC Khoo
Quality Engineering 16 (1), 27-43, 2003
912003
Monitoring process mean and variability with one double EWMA chart
MBC Khoo, SY Teh, Z Wu
Communications in Statistics—Theory and Methods 39 (20), 3678-3694, 2010
842010
Run-sum control charts for monitoring the coefficient of variation
WL Teoh, MBC Khoo, P Castagliola, WC Yeong, SY Teh
European Journal of Operational Research 257 (1), 144-158, 2017
832017
An efficient adaptive EWMA control chart for monitoring the process mean
A Haq, R Gulzar, MBC Khoo
Quality and Reliability Engineering International 34 (4), 563-571, 2018
762018
Monitoring the coefficient of variation: A literature review
Z Jalilibal, A Amiri, P Castagliola, MBC Khoo
Computers & Industrial Engineering 161, 107600, 2021
752021
A new synthetic control chart for monitoring process mean using auxiliary information
A Haq, MBC Khoo
Journal of Statistical Computation and Simulation 86 (15), 3068-3092, 2016
742016
A control chart for the multivariate coefficient of variation
WC Yeong, MBC Khoo, WL Teoh, P Castagliola
Quality and Reliability Engineering International 32 (3), 1213-1225, 2016
742016
Optimal design of the synthetic chart for the process mean based on median run length
MBC Khoo, VH Wong, Z Wu, P Castagliola
IIE Transactions 44 (9), 765-779, 2012
742012
An np control chart for monitoring the mean of a variable based on an attribute inspection
Z Wu, MBC Khoo, L Shu, W Jiang
International Journal of Production Economics 121 (1), 141-147, 2009
722009
Two improved runs rules for the Shewhart X control chart
MBC Khoo, KN Ariffin
Quality Engineering 18 (2), 173-178, 2006
702006
Two improved runs rules for the Shewhart X control chart
MBC Khoo, KN Ariffin
Quality Engineering 18 (2), 173-178, 2006
702006
Two Improved Runs Rules for the Shewhart Control Chart
MBC Khoo, KN Ariffin
Quality Engineering 18 (2), 173-178, 2006
702006
Optimal design of the double sampling X chart with estimated parameters based on median run length
WL Teoh, MBC Khoo, P Castagliola, S Chakraborti
Computers & Industrial Engineering 67, 104-115, 2014
692014
A combined synthetic&X chart for monitoring the process mean
Z Wu, Y Ou, P Castagliola, MBC Khoo
International Journal of Production Research 48 (24), 7423-7436, 2010
682010
A double moving average control chart
MBC Khoo, VH Wong
Communications in Statistics—Simulation and Computation® 37 (8), 1696-1708, 2008
682008
The system can't perform the operation now. Try again later.
Articles 1–20