Follow
Omar Jorge Ibarra-Rojas
Omar Jorge Ibarra-Rojas
Autonomous University of Nuevo Leon
Verified email at uanl.edu.mx - Homepage
Title
Cited by
Cited by
Year
Planning, operation, and control of bus transport systems: A literature review
OJ Ibarra-Rojas, F Delgado, R Giesen, JC Muñoz
Transportation Research Part B: Methodological 77, 38-75, 2015
7482015
Synchronization of bus timetabling
OJ Ibarra-Rojas, YA Rios-Solis
Transportation Research Part B: Methodological 46 (5), 599-614, 2012
2922012
An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks
OJ Ibarra-Rojas, R Giesen, YA Rios-Solis
Transportation Research Part B: Methodological 70, 35-46, 2014
1612014
Multiperiod bus timetabling
OJ Ibarra-Rojas, F López-Irarragorri, YA Rios-Solis
Transportation Science 50 (3), 805-822, 2016
902016
Vehicle and Crew Scheduling for Flexible Bus Transportation Systems
V Boyer, OJ Ibarra-Rojas, YA Ríos-Solís
Transportation Research B 112, 216-229, 2018
622018
Valid inequalities for the synchronization bus timetabling problem
P Fouilhoux, OJ Ibarra-Rojas, S Kedad-Sidhoum, YA Rios-Solis
European Journal of Operational Research 251 (2), 442-450, 2016
612016
A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production
EP Y.A. Rios-Solis, O.J. Ibarra-Rojas, M. Cabo
European Journal of Operational Research, 2020
322020
Synchronizing different transit lines at common stops considering travel time variability along the day
OJ Ibarra-Rojas, JC Muñoz
Transportmetrica A: Transport Science 12 (8), 751-769, 2016
282016
The Accessibility Vehicle Routing Problem
OJ Ibarra-Rojas, L Hernandez, L Ozuna
Journal of Cleaner Production 172, 1514-1528, 2018
252018
A decomposition approach for the piece–mold–machine manufacturing problem
OJ Ibarra-Rojas, RZ Ríos-Mercado, YA Rios-Solis, MA Saucedo-Espinosa
International Journal of Production Economics 134 (1), 255-261, 2011
182011
Using the maximal covering location problem to design a sustainable recycling network
XD Medrano-Gómez, D Ferreira, EAV Toso, OJ Ibarra-Rojas
Journal of cleaner production 275, 124020, 2020
152020
An integrated approach for the rectangular delineation of management zones and the crop planning problems
OJIR Nestor Cid-Garcia
Computers and Electronics in Agriculture 164, 2019
142019
The maximal covering location problem with accessibility indicators
OJ Ibarra-Rojas, L Ozuna, D López-Piñón
Socio-Economic Planning Sciences 71, 100758, 2020
132020
Timetabling with flexible frequencies to synchronise groups of bus lines at common stops
YI Silva-Soto, OJ Ibarra-Rojas
Transportmetrica A: Transport Science, 978-1001, 2020
122020
Integrating frequency setting, timetabling, and route assignment to synchronize transit lines
OJ Ibarra-Rojas, JC Muñoz, R Giesen, P Knapp
Journal of Advanced Transportation 2019, 2019
122019
Integrating synchronization bus timetabling and single-depot single-type vehicle scheduling
OJ Ibarra-Rojas, Y Rios-Solis
Integrating synchronization bus timetabling and single-depot single-type …, 2011
112011
Vehicle routing problem considering equity of demand satisfaction
OJ Ibarra-Rojas, Y Silva-Soto
Optimization Letters, 1-23, 2021
92021
A two-stage sequential approach for scheduling with lot-sizing decisions in the context of plastic injection systems
KI Cervantes-Sanmiguel, MJ Vargas-Flores, OJ Ibarra-Rojas
Computers & Industrial Engineering 151, 106969, 2021
92021
Analyzing the trade-off between minimizing travel times and reducing monetary costs for users in the transit network design
KI Cervantes-Sanmiguel, MV Chávez-Hernández, OJ Ibarra-Rojas
Transportation Research Part B: Methodological 173 (1), 142-161, 2023
82023
Piece-mold-machine manufacturing planning
OJ Ibarra-Rojas, YA Rios-Solis, OL Chacon-Mondragón
Intelligent Systems in Operations: Methods, Models and Applications in the …, 2010
72010
The system can't perform the operation now. Try again later.
Articles 1–20