Follow
GH Wan
Title
Cited by
Cited by
Year
Competitive two-agent scheduling and its applications
JYT Leung, M Pinedo, G Wan
Operations Research 58 (2), 458-469, 2010
2262010
Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties
G Wan, BPC Yen
European Journal of Operational Research 142 (2), 271-281, 2002
1812002
Including subjective norm and technology trust in the technology acceptance model: a case of e-ticketing in China
C Lee, G Wan
ACM SIGMIS Database: The DATABASE for Advances in Information Systems 41 (4 …, 2010
1512010
Automatic multilabel electrocardiogram diagnosis of heart rhythm or conduction abnormalities with deep learning: a cohort study
YY Hongling Zhu, Cheng Cheng, Hang Yin, Xingyi Li, Ping Zuo, Jia Ding, Fan ...
Lancet Digital Health 2, e348–57, 2020
1292020
Scheduling two agents with controllable processing times
G Wan, SR Vakati, JYT Leung, M Pinedo
European Journal of Operational Research 205 (3), 528-539, 2010
1112010
Parallel machine selection and job scheduling to minimize machine cost and job tardiness
D Cao, M Chen, G Wan
Computers & operations research 32 (8), 1995-2012, 2005
1112005
Managing appointment-based services in the presence of walk-in customers
S Wang, N Liu, G Wan
Management Science 66 (2), 667-686, 2020
712020
Financing and coordinating the supply chain with a capital-constrained supplier under yield uncertainty
W Ding, G Wan
International journal of production economics 230, 107813, 2020
582020
Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs
G Wan, BPC Yen
European Journal of Operational Research 195 (1), 89-97, 2009
552009
The effect of financing on a budget-constrained supply chain under wholesale price contract
X Chen, G Wan
Asia-Pacific Journal of Operational Research 28 (04), 457-485, 2011
542011
Home service routing and appointment scheduling with stochastic service times
Y Zhan, Z Wang, G Wan
European Journal of Operational Research 288 (1), 98-110, 2021
522021
A note on appointment scheduling with piecewise linear cost functions
D Ge, G Wan, Z Wang, J Zhang
Mathematics of Operations Research 39 (4), 1244-1251, 2014
492014
Single machine scheduling to minimize total compression plus weighted flow cost is NP-hard
G Wan, BPC Yen, CL Li
Information Processing Letters 79 (6), 273-280, 2001
482001
Vehicle routing and appointment scheduling with team assignment for home services
Y Zhan, G Wan
Computers & operations research 100, 1-11, 2018
462018
Scheduling with variable time slot costs
G Wan, X Qi
Naval Research Logistics (NRL) 57 (2), 159-171, 2010
432010
Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating
G Wan, Y Zhan
International Transactions in Operational Research 28 (4), 2191-2217, 2021
312021
Single machine bicriteria scheduling: a survey
PC Benjamin, WAN Guohua
International Journal of Industrial Engineering 10 (3), 222-231, 2003
272003
Integrated order selection and production scheduling under MTO strategy
S Huang, M Lu, G Wan
International Journal of Production Research 49 (13), 4085-4101, 2011
252011
Resource-constrained machine scheduling with machine eligibility restriction and its applications to surgical operations scheduling
S Wang, H Su, G Wan
Journal of Combinatorial Optimization 30, 982-995, 2015
242015
Parallel machine scheduling with eligibility constraints: A composite dispatching rule to minimize total weighted tardiness
H Su, M Pinedo, G Wan
Naval Research Logistics (NRL) 64 (3), 249-267, 2017
182017
The system can't perform the operation now. Try again later.
Articles 1–20