Follow
Robert C. LEACHMAN
Robert C. LEACHMAN
Professor of Industrial Engineering and Operations Research
Verified email at berkeley.edu - Homepage
Title
Cited by
Cited by
Year
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
YF Hung, RC Leachman
IEEE Transactions on Semiconductor manufacturing 9 (2), 257-269, 1996
3151996
A general framework for modeling production
ST Hackman, RC Leachman
Management Science 35 (4), 478-495, 1989
2581989
An improved methodology for real-time production decisions at batch-process work stations
WW Weng, RC Leachman
IEEE transactions on semiconductor manufacturing 6 (3), 219-225, 1993
1551993
Benchmarking semiconductor manufacturing
RC Leachman, DA Hodges
IEEE transactions on semiconductor manufacturing 9 (2), 158-169, 1996
1511996
A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands
RC Leachman, A Gascon
Management Science 34 (3), 377-390, 1988
1451988
On capacity modeling for production planning with alternative machine types
RC Leachman, TF Carmon
IIE transactions 24 (4), 62-72, 1992
1431992
IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation—Semiconductor Sector
RC Leachman, RF Benson, C Liu, DJ Raar
Interfaces 26 (1), 6-37, 1996
1411996
Modeling train movements through complex rail networks
Q Lu, M Dessouky, RC Leachman
ACM Transactions on Modeling and Computer Simulation (TOMACS) 14 (1), 48-75, 2004
1362004
SLIM: Short cycle time and low inventory in manufacturing at Samsung Electronics
RC Leachman, J Kang, V Lin
Interfaces 32 (1), 61-77, 2002
1362002
Port and modal allocation of waterborne containerized imports from Asia to the United States
RC Leachman
Transportation Research Part E: Logistics and Transportation Review 44 (2 …, 2008
1122008
Modeling techniques for automated production planning in the semiconductor industry
RC Leachman
Optimization in industry 1, 1, 1993
1121993
Closed-loop measurement of equipment efficiency and equipment capacity
RC Leachman
IEEE Transactions on Semiconductor manufacturing 10 (1), 84-97, 1997
1001997
An exact solution procedure to determine the optimal dispatching times for complex rail networks
MM Dessouky, Q Lu, J Zhao, RC Leachman
IIE transactions 38 (2), 141-152, 2006
952006
A batch splitting method for a job shop scheduling problem in an MRP environment
HI Jeong, J Park, RC Leachman
International Journal of Production Research 37 (15), 3583-3598, 1999
861999
A simulation modeling methodology for analyzing large complex rail networks
MM Dessouky, RC Leachman
Simulation 65 (2), 131-142, 1995
861995
A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem
A Gascon, RC Leachman
Operations Research 36 (1), 50-56, 1988
841988
Resource-constrained scheduling of projects with variable-intensity activities
RC Leachman, A Dtncerler, S Kim
IIE transactions 22 (1), 31-40, 1990
811990
Reduced simulation models of wafer fabrication facilities
YF Hung, RC Leachman
International Journal of Production Research 37 (12), 2685-2701, 1999
791999
Economic efficiency analysis of wafer fabrication
RC Leachman, S Ding, CF Chien
IEEE Transactions on Automation Science and Engineering 4 (4), 501-512, 2007
762007
Globalization of semiconductors: Do real men have fabs, or virtual fabs?
RC Leachman, CH Leachman
Locating Global Advantage: Industry Dynamics in the International Economy …, 2004
622004
The system can't perform the operation now. Try again later.
Articles 1–20