Follow
Eugene Levner
Eugene Levner
Verified email at hit.ac.il
Title
Cited by
Cited by
Year
Целочисленное программирование и потоки в сетях
TC Hu, BG Litvak, AA Fridman, PL Buzickij, EV Levner
Мир, 1974
4731974
Cyclic scheduling in robotic flowshops
Y Crama, V Kats, J Van de Klundert, E Levner
Annals of operations Research 96, 97-124, 2000
2732000
Complexity of cyclic scheduling problems: A state-of-the-art survey
E Levner, V Kats, DAL De Pablo, TCE Cheng
Computers & Industrial Engineering 59 (2), 352-361, 2010
2262010
An improved algorithm for cyclic flowshop scheduling in a robotic cell
E Levner, V Kats, VE Levit
European Journal of Operational Research 97 (3), 500-508, 1997
1341997
Perishable inventory management with dynamic pricing using time–temperature indicators linked to automatic detecting devices
A Herbon, E Levner, TCE Cheng
International Journal of Production Economics 147, 605-613, 2014
1312014
Adaptive scheduling server for power-aware real-time tasks
P Mejia-Alvarez, E Levner, D Mossé
ACM Transactions on Embedded Computing Systems (TECS) 3 (2), 284-306, 2004
1282004
Fast approximation algorithm for job sequencing with deadlines
GV Gens, EV Levner
Discrete Applied Mathematics 3 (4), 313-318, 1981
1221981
Computational complexity of approximation algorithms for combinatorial problems
GV Gens, EV Levner
International Symposium on Mathematical Foundations of Computer Science, 292-300, 1979
1171979
Multiple-part cyclic hoist scheduling using a sieve method
V Kats, E Levner, L Meyzin
IEEE Transactions on Robotics and Automation 15 (4), 704-713, 1999
1101999
Entropy-based model for the ripple effect: managing environmental risks in supply chains
E Levner, A Ptuskin
International Journal of Production Research 56 (7), 2539-2551, 2018
942018
Optimal planning of parts' machining on a number of machines
EV Levner
Automatin and Remote Control 12 (12), 1972-1978, 1969
941969
A parametric critical path problem and an application for cyclic scheduling
E Levner, V Kats
Discrete Applied Mathematics 87 (1-3), 149-158, 1998
851998
A polynomial algorithm for 2-degree cyclic robot scheduling
A Che, C Chu, E Levner
European Journal of Operational Research 145 (1), 31-44, 2003
802003
Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
K Hiraishi, E Levner, M Vlach
Computers & Operations Research 29 (7), 841-848, 2002
792002
Cyclic scheduling in a robotic production line
V Kats, E Levner
Journal of Scheduling 5 (1), 23-41, 2002
772002
A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling
V Kats, E Levner
Operations Research Letters 21 (4), 171-179, 1997
661997
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
V Kats, L Lei, E Levner
European Journal of Operational Research 187 (3), 1196-1211, 2008
622008
Minimizing the number of robots to meet a given cyclic schedule
V Kats, E Levner
Annals of Operations Research 69 (0), 209-226, 1997
581997
Social media engagement and influenza vaccination during the COVID-19 pandemic: cross-sectional survey study
A Benis, A Khodos, S Ran, E Levner, S Ashkenazi
Journal of medical Internet research 23 (3), e25977, 2021
572021
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
K Kogan, E Levner
Computers & operations research 25 (1), 53-62, 1998
501998
The system can't perform the operation now. Try again later.
Articles 1–20