Ponnambalam S G
Ponnambalam S G
Professor (HAG), School of Mechanical Engineering, Vellore Institute of Technology (VIT), Vellore
Verified email at vit.ac.in
Title
Cited by
Cited by
Year
A multi-objective genetic algorithm for solving assembly line balancing problem
SG Ponnambalam, P Aravindan, GM Naidu
The International Journal of Advanced Manufacturing Technology 16 (5), 341-352, 2000
1942000
An extensive review of research in swarm robotics
Y Mohan, SG Ponnambalam
2009 World Congress on Nature & Biologically Inspired Computing (NaBIC), 140-145, 2009
1572009
A hybrid cuckoo search and genetic algorithm for reliability–redundancy allocation problems
G Kanagaraj, SG Ponnambalam, N Jawahar
Computers & Industrial Engineering 66 (4), 1115-1124, 2013
1542013
A comparative evaluation of assembly line balancing heuristics
SG Ponnambalam, P Aravindan, GM Naidu
The International Journal of Advanced Manufacturing Technology 15 (8), 577-586, 1999
1231999
A multiobjective genetic algorithm for job shop scheduling
SG Ponnambalam, V Ramkumar, N Jawahar
Production Planning & Control 12 (8), 764-774, 2001
1182001
A tabu search algorithm for job shop scheduling
SG Ponnambalam, P Aravindan, SV Rajesh
The International Journal of Advanced Manufacturing Technology 16 (10), 765-771, 2000
1092000
Genetic algorithms for sequencing problems in mixed model assembly lines
SG Ponnambalam, P Aravindan, MS Rao
Computers & Industrial Engineering 45 (4), 669-690, 2003
1022003
Evolutionary algorithms for scheduling m-machine flow shop with lot streaming
S Marimuthu, SG Ponnambalam, N Jawahar
Robotics and Computer-Integrated Manufacturing 24 (1), 125-139, 2008
992008
A TSP-GA multi-objective algorithm for flow-shop scheduling
SG Ponnambalam, H Jagannathan, M Kataria, A Gadicherla
The International Journal of Advanced Manufacturing Technology 23 (11-12 …, 2004
912004
Threshold accepting and ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming
S Marimuthu, SG Ponnambalam, N Jawahar
Journal of materials processing technology 209 (2), 1026-1041, 2009
902009
Comparative evaluation of genetic algorithms for job-shop scheduling
SG Ponnambalam, P Aravindan, PS Rao
Production Planning & Control 12 (6), 560-574, 2001
842001
A simulated annealing algorithm for job shop scheduling
SG Ponnambalam, N Jawahar, P Aravindan
Production Planning & Control 10 (8), 767-777, 1999
801999
A genetic algorithm for scheduling flexible manufacturing systems
N Jawahar, P Aravindan, SG Ponnambalam
The International Journal of Advanced Manufacturing Technology 14 (8), 588-607, 1998
801998
An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems
JM Nilakantan, GQ Huang, SG Ponnambalam
Journal of Cleaner Production 90, 311-325, 2015
792015
Constructive and improvement flow shop scheduling heuristics: an extensive evaluation
SG Ponnambalam, P Aravindan, S Chandrasekaran
Production Planning & Control 12 (4), 335-344, 2001
692001
Obstacle avoidance control of redundant robots using variants of particle swarm optimization
GS Chyan, SG Ponnambalam
Robotics and Computer-Integrated Manufacturing 28 (2), 147-153, 2012
652012
A GA-SA multiobjective hybrid search algorithm for integrating lot sizing and sequencing in flow-line scheduling
SG Ponnambalam, M Reddy
The International Journal of Advanced Manufacturing Technology 21 (2), 126-137, 2003
652003
Review on life cycle inventory: methods, examples and applications
S Islam, SG Ponnambalam, HL Lam
Journal of Cleaner Production 136, 266-278, 2016
602016
A multiobjective genetic algorithm for scheduling a flexible manufacturing system
SS Sankar, SG Ponnanbalam, C Rajendran
The International Journal of Advanced Manufacturing Technology 22 (3-4), 229-236, 2003
592003
Mobile robot path planning using ant colony optimization
YZ Cong, SG Ponnambalam
2009 IEEE/ASME International Conference on Advanced Intelligent Mechatronics …, 2009
582009
The system can't perform the operation now. Try again later.
Articles 1–20