Olli Seppänen
Olli Seppänen
Verified email at aalto.fi
Title
Cited by
Cited by
Year
Location-based management for construction: Planning, scheduling and control
R Kenley, O Seppänen
Routledge, 2006
2632006
The Combination of Last Planner System and Location-Based Management System.
O Seppänen, G Ballard, S Pesonen
Lean construction journal, 2010
1642010
Location-based management of construction projects: Part of a new typology for project scheduling methodologies
R Kenley, O Seppänen
Proceedings of the 2009 Winter Simulation Conference (WSC), 2563-2570, 2009
782009
Empirical research on the success of production control in building construction projects
O Seppänen
Teknillinen korkeakoulu, 2009
772009
Comparison between location based management and takt time planning
AG Frandson, O Seppänen, ID Tommelein
Proceedings of the 23rd Annual Conference of the International Group for …, 2015
552015
Effects of the location-based management system on production rates and productivity
O Seppänen, J Evinger, C Mouflard
Construction management and economics 32 (6), 608-624, 2014
502014
A case study of line-of-balance based schedule planning and control system
O Seppänen, E Aalto
13th Annual conference of Lean Construction, 2005
472005
A line-of-balance based schedule planning and control system
J Kankainen, O Seppänen
11th Annual conference on Lean Construction, 22-24, 2003
392003
Implementation of line-of-balance based scheduling and project control system in a large construction company
M Soini, I Leskelä, O Seppänen
12th Annual conference of Lean Construction, 2004
382004
Construction flow index: a metric of production flow quality in construction
R Sacks, O Seppänen, V Priven, J Savosnick
Construction management and economics 35 (1-2), 45-63, 2017
352017
A comparison of takt time and LBMS planning methods
O Seppänen
Proc. 22nd Ann. Conf. of the IntĒl Group for Lean Construction, 23-27, 2014
332014
Performance measurement using location-based status data
O Seppänen, R Kenley
Proceedings of International Group for Lean Construction (IGLC)-13, 263-269, 2005
332005
Integration of last planner system and location-based management system
O Seppänen, R Modrich, G Ballard
Proc. 23rd Annual Conference of the International Group for Lean …, 2015
322015
Empirical research on deviations in production and current state of project control
O Seppänen, J Kankainen
Annual Conference of the International Group for Lean Construction 12, 2004
312004
Improving workflow and resource usage in construction schedules through location-based management system (LBMS)
H Olivieri, O Seppänen, A Denis Granja
Construction management and economics 36 (2), 109-124, 2018
282018
Production control using location-based management system on a hospital construction project
T Kala, C Mouflard, O Seppänen
20th Annual Conference of the International Group for Lean Construction, San …, 2012
272012
System and method for modeling construction risk using location-based construction planning models
OPP Seppanen, IPS Pelkonen, TM Wessman
US Patent 7,752,020, 2010
272010
Categorizing modularization strategies to achieve various objectives of building investments
A Peltokorpi, H Olivieri, AD Granja, O Seppänen
Construction Management and Economics 36 (1), 32-48, 2018
242018
A comparison of location-based scheduling with the traditional critical path method
RH Lowe, MF DĒOnofrio, DM Fisk, O Seppänen
ANNUAL MEETING AMERICAN COLLEGE OF CONSTRUCTION LAWYERS, San Francisco, 2012
232012
Real-time resource tracking for analyzing value-adding time in construction
J Zhao, O Seppänen, A Peltokorpi, B Badihi, H Olivieri
Automation in Construction 104, 52-65, 2019
172019
The system can't perform the operation now. Try again later.
Articles 1–20