Follow
Christos Akratos
Title
Cited by
Cited by
Year
Effect of temperature, HRT, vegetation and porous media on removal efficiency of pilot-scale horizontal subsurface flow constructed wetlands
CS Akratos, VA Tsihrintzis
Ecological engineering 29 (2), 173-191, 2007
9122007
Vertical flow constructed wetlands: eco-engineering systems for wastewater and sludge treatment
A Stefanakis, CS Akratos, VA Tsihrintzis
Newnes, 2014
4042014
Olive mill waste composting: A review
AKMMB Chowdhury, CS Akratos, DV Vayenas, S Pavlou
International Biodeterioration & Biodegradation 85, 108-119, 2013
1992013
An artificial neural network model and design equations for BOD and COD removal prediction in horizontal subsurface flow constructed wetlands
CS Akratos, JNE Papaspyros, VA Tsihrintzis
Chemical Engineering Journal 143 (1-3), 96-110, 2008
1682008
Performance and cost comparison of a FWS and a VSF constructed wetland system
VA Tsihrintzis, CS Akratos, GD Gikas, D Karamouzis, AN Angelakis
Environmental technology 28 (6), 621-628, 2007
1102007
Chromium removal in constructed wetlands: a review
MY Sultana, CS Akratos, S Pavlou, DV Vayenas
International Biodeterioration & Biodegradation 96, 181-190, 2014
1082014
Characterization of rain and roof drainage water quality in Xanthi, Greece
P Melidis, CS Akratos, VA Tsihrintzis, E Trikilidou
Environmental monitoring and assessment 127, 15-27, 2007
1072007
Treatment of olive mill wastewater in pilot-scale vertical flow constructed wetlands
E Herouvim, CS Akratos, A Tekerlekopoulou, DV Vayenas
Ecological engineering 37 (6), 931-939, 2011
1052011
Zeolite as a potential medium for ammonium recovery and second cheese whey treatment
A Kotoulas, D Agathou, IE Triantaphyllidou, TI Tatoulis, CS Akratos, ...
Water 11 (1), 136, 2019
972019
Effluent quality improvement of two pilot-scale, horizontal subsurface flow constructed wetlands using natural zeolite (clinoptilolite)
AI Stefanakis, CS Akratos, GD Gikas, VA Tsihrintzis
Microporous and Mesoporous Materials 124 (1-3), 131-143, 2009
962009
Total nitrogen and ammonia removal prediction in horizontal subsurface flow constructed wetlands: use of artificial neural networks and development of a design equation
CS Akratos, JNE Papaspyros, VA Tsihrintzis
Bioresource technology 100 (2), 586-596, 2009
962009
Effect of wastewater step-feeding on removal efficiency of pilot-scale horizontal subsurface flow constructed wetlands
AI Stefanakis, CS Akratos, VA Tsihrintzis
Ecological Engineering 37 (3), 431-443, 2011
952011
Biotreatment of raisin and winery wastewaters and simultaneous biodiesel production using a Leptolyngbya-based microbial consortium
ON Tsolcha, AG Tekerlekopoulou, CS Akratos, G Aggelis, S Genitsaris, ...
Journal of cleaner production 148, 185-193, 2017
892017
A novel horizontal subsurface flow constructed wetland: Reducing area requirements and clogging risk
T Tatoulis, CS Akratos, AG Tekerlekopoulou, DV Vayenas, AI Stefanakis
Chemosphere 186, 257-268, 2017
762017
Artificial neural network use in ortho-phosphate and total phosphorus removal prediction in horizontal subsurface flow constructed wetlands
CS Akratos, JNE Papaspyros, VA Tsihrintzis
Biosystems Engineering 102 (2), 190-201, 2009
682009
Effect of hydraulic retention time, temperature, and organic load on a horizontal subsurface flow constructed wetland treating cheese whey wastewater
MY Sultana, C Mourti, T Tatoulis, CS Akratos, AG Tekerlekopoulou, ...
Journal of Chemical Technology & Biotechnology 91 (3), 726-732, 2016
652016
Surplus activated sludge dewatering in pilot-scale sludge drying reed beds
AI Stefanakis, CS Akratos, P Melidis, VA Tsihrintzis
Journal of Hazardous Materials 172 (2-3), 1122-1130, 2009
652009
Removal of pathogenic bacteria in constructed wetlands: mechanisms and efficiency
SI Alexandros, CS Akratos
Phytoremediation: Management of Environmental Contaminants, Volume 4, 327-346, 2016
622016
Composting of olive leaves and pomace from a three-phase olive mill plant
M Michailides, G Christou, CS Akratos, AG Tekerlekopoulou, DV Vayenas
International Biodeterioration & Biodegradation 65 (3), 560-564, 2011
602011
Water quality trends in Polyphytos reservoir, Aliakmon river, Greece
GD Gikas, VA Tsihrintzis, CS Akratos, G Haralambidis
Environmental monitoring and assessment 149, 163-181, 2009
592009
The system can't perform the operation now. Try again later.
Articles 1–20